Construction notice
The State Mobility Agency (LBM) began construction of a traffic circle Aug. 19 at the intersection of K25 and K26 near Rodenbach.
At the same time, the bicycle path along K25 between Rodenbach and Weilerbach will also be paved, and the road surface at the intersection of K13 and K25 will be renewed.
These extensive measures will necessitate a full closure of K25. Traffic between Rodenbach and Weilerbach and Einsiedlerhof will be re-routed from K13 via L389 and L369.
Construction is estimated to be completed by the end of the year.