Road work
Roadway work is scheduled on Kisling Drive from Monday to Aug. 15. Road closures will be between Maxwell Avenue (Burger King) and NATO Circle (Mitchell Avenue).
Kisling Drive will close to vehicular traffic during this time, and traffic will be detoured around the construction site via Jefferson Avenue to the north or Harmon Avenue to the south or Maxwell Avenue. The reconstruction is needed to improve roadway safety and ride quality and to reduce wear and tear on vehicles.
Phase I: Monday to July 27 — Kisling Drive between Lincoln Boulevard Circle and Bldg. 310, road closed; access to Bldgs. 100s, 200s and 300s from the east via NATO Circle, no drive through traffic on Kisling between NATO Circle and Lincoln Circle.
Phase II: July 28 to Aug. 6 — Kisling Drive between NATO Circle and Bldg. 310, road closed; access to Bldgs. 100s, 200s and 300s from the west via Lincoln Boulevard Circle, no drive through traffic on Kisling between NATO Circle and Lincoln Circle.
Phase III: Aug. 7 to Aug. 15 — Kisling Drive between Maxwell Avenue (traffic light) and Lincoln Circle will be closed; detour via Maxwell Avenue east or west and Lincoln north or south. Access to the commissary is available via detour from Maxwell to Lincoln to New York Avenue.
Traffic delays can be expected during this time frame, and alternative routes should be taken to avoid delays. Drivers should exercise extreme caution due to proximity of heavy construction traffic. For everyone’s safety, obey the traffic laws and regulations. Watch for more updates in the KA.
For details, call Garry Jaggers at 480-9475.