Photos by Airman 1st Classs Joshua Magbanua
A snow plow removes snow on the flightline Jan. 10 on Ramstein. Snow removal operations commenced throughout Ramstein as continuous snow persisted throughout the majority of the day. Other snow removal operations included de-icing aircraft and applying salt to roads and walkways.
January 19, 2017 ×
Photo by Airman 1st Class Lane T. Plummer
January 19, 2017 ×
by Petra Lessoing
86th Airlift Wing Public Affairs
Residents living off-base in German communities must know the rules regarding snow and ice on sidewalks. Residents should check their rental contracts to find out about their obligations. The rental contract clearly states who must keep sidewalks free of ice and snow.
December 12, 2013 ×
by Master Sgt. Adegboyega Adeyemo
786th Civil Engineer Squadron
Every winter the 786th Civil Engineer Squadron fights an uphill battle to keep Mother Nature at bay. To keep the mission going, the “snow team,” which includes the 786th CES Heavy Equipment shop and volunteers from other CE shops, stands ready to face the blustering winds and bitter cold in order to keep runways and streets clear of snow and ice.
November 7, 2013 ×